NU BOYANA STUDIOS

BULGARIA / 2024
SOFIA
The studios are most of the time busy with large long-term film projects. Need to be checked in advance.
Studio 1 - 580 m2
Studio 2 - 960 m2
Studio 3 - 580 m2
Studio 5 - 1500 m2
Studio 12 - 1764 m2
Studio 13 - 1470 m2

Floor – flat
Trusses – no
Electricity – yes
Lift/scissor lift / pekkaniska - no

Additional spaces:
Office
Makeup
Wardrobe
Toilet
STUDIO 1
STUDIO 2
STUDIO 3
STUDIO 5
STUDIO 12
STUDIO 13
WATER TANK
At a size of 20m x 20m x 6m deep, (65ft x 65ft x 20ft deep ) and a Volume of 2400m3. It has a UV filtration system reducing the use of chlorine thus reducing costume, set bleach out and actor's eye/skin irritation.

The Filtration system has a water turnover of every 6 hours and is maintained at 22C degrees with the capacity to be heated to 33C degrees if required.
The viewing gallery houses a glass-viewing window of 2m by 1.5m.
The tank also has a built in Skimmer system for removing surface dust and impurities.
The main area has a 5m floor working area space around the tank with a 10-ton Bridge crane and 13m working height to the underside of the overhead Gantries.
There are three large access doors for loading and off loading of equipment.


Video of water tank construction:
https://vimeo.com/252716486

Show reel:
https://vimeo.com/379448178
Your production partner in Bulgaria, Serbia, Lithuania, Georgia, Kazakhstan, Ukraine